6.8Importing and exporting a plan

Available in:EnglishFrançais

Users who have permission to change the work can import work items from spreadsheets or project files. Anyone who can open the project can export the schedule.

Importing a plan

To import work items, select the Work items tab and choose Import a file….

You can upload a .csv, .xlsx, or Microsoft Project .xml file. Compatible XML files can be saved from Microsoft Project (File › Save as › XML), GanttProject, ProjectLibre, or OpenProject. A .mpp file must be saved as XML before uploading.

Mapping columns and reviewing data

When importing a CSV or Excel file, configure the import settings:

  1. Match the columns. Bmator suggests what each column becomes: ID, Parent ID, Outline level or Outline number for phases, Name, Milestone, Start, Due / Finish (which maps to Due), Duration (such as 3d or 16h), Effort, Assigned to by email, Status, % complete, Predecessors in Microsoft Project's format (such as 2FS+1d), Priority, Deadline, or Description.
  2. Any column left as Keep it with the work item is retained with the Work item.
  3. Specify date ordering for ambiguous dates such as 03/04/2026 by selecting whether day or month comes first.
  4. Update the preview to verify the parsed structure.

How data is processed

Before anything is written, the preview outlines the planned changes:

  • It displays how many work items will be added or updated, along with phases, milestones, and dependencies.
  • It lists people found by email address and indicates how many have an existing account. Users are assigned without the project being shared with them, while unrecognized emails are recorded by address. Nobody is invited or notified by email, and names lacking an email address are not assigned.
  • The preview shows the first rows structured as an outline, along with warnings about anything that cannot be imported.
  • Dependencies rejected by the platform (such as links pointing to a phase or circular loops) are skipped and counted.
  • Re-importing a file with an ID column or importing an updated Project XML file updates existing items rather than duplicating them. If no ID column is present, items are added again, which the preview notes.

Select the import button in the preview to write the changes.

Exporting a plan

To export the project schedule, open the Work items tab and select Export. The dates exported match the planned dates shown on the Gantt chart.

You can choose from the following formats:

  • Excel or CSV: Exports the standard plan columns. Files exported in this format can be imported back whole without losing column structure.
  • MS Project (XML): Exports an XML file compatible with Microsoft Project, GanttProject, or ProjectLibre.
  • Calendar (.ics): Exports milestones and due dates as all-day events suitable for any standard calendar application.